Bindoo Wind Farm
Technical (on-site) Advisor
Onshore Wind
Airtricity
County Cavan, Ireland
32 turbines totalling 48MW
Technical advisor to this world leading wind farm developer.
Responsible for assuring the compliance of the engineering requirements as specified in the balance of plant contract.
32 GE manufactured turbines with a connection voltage of 110kV
None stated